Resonance DecisionOS New releaseNew

Make faster decisions in complex operations.

DecisionOS is an intelligence layer on top of the systems you already use. It turns your data into a plan: which households move where, which units to rehab first, and which buildings fit your portfolio. Every recommendation shows the rules and numbers behind it.

From the team behind Resonance. Works with Resonance or on its own.

Building C start moved to Mar 2309:14:02
Change detected
Your team
RMRelocation managerlimit $10,000 DDDirector of Developmentlimit $50,000
DecisionOS intelligence layer
AI readsmessy data → facts
ADA_REQ=YNeeds accessible unit
"3bd" / "3 BR"3 bedrooms
start 3/9 → 3/23Building C slips 14 days
Engine decidesyour rules
  • Bedroom size
  • Accessible unit
  • Notice period
  • Lease dates
0 of 9 households re-placed
Plan v14 in effect · 46 households Plan v15 · 9 moves · 37 unchanged0 violations+$14,200
Your systems of record stay as they are
Resonancehouseholds
Yardirent roll
Procoreschedule
Excelbudget
You keep your systems. DecisionOS reads from them, then decides by your rules.Illustrative

Your systems tell you what's true. They don't tell you what to do.

Yardi knows the rent roll. Procore knows the schedule. Working out what to do with both still happens by hand.

Plans break when the schedule moves.

The contractor slips two weeks. Someone then spends a week rebuilding the move plan in a spreadsheet.

The reasoning lives in people's heads.

Teams make decisions over email and in meetings. Six months later, no one can show why.

AI chat tools aren't built for this.

Ask twice and you may get two different answers. You can't take that to a board or to HUD.

A start date slips. Nine households move. Thirty-seven stay put.

DecisionOS re-plans only what a change touches, shows the rule behind every move, and returns the same plan for the same inputs every time.

16 seconds · no sound · pause or step through anytime
Alder Court redevelopmentBuilding C relocation plan
Plan v14In effect
Plan in placePlan
Schedule changeChange
Impact checkImpact
Re-planRe-plan
Check and approveApprove
Paused while you look
No open changes. Plan v14 was approved Feb 12.
Building C construction start slips 2 weeksMar 9 → Mar 23 Read from the construction schedule
0households re-assigned
46keep their unit
46/ 56temporary units in use
0rule violations

    Same inputs, same plan.

    Plan v14 was approved by the Relocation Manager. Its cost was inside the manager's limit.
    Added moving cost in v15$0
    Manager limit $10,000
    Relocation Managercan approve to $10,000
    Director of Developmentnot needed

    Simulation summary: a relocation plan places 46 households in 56 temporary units across four sites. Building C's construction start slips two weeks, which would leave nine households in Hollis Street units past the end of that lease. The engine re-assigns only those nine households to vacant units at other sites, each for a stated rule: bedroom size, accessible unit, notice period or school district. Thirty-seven households keep their unit, there are zero rule violations, and because the added moving cost of $14,200 is over the Relocation Manager's $10,000 limit, the new plan is sent to the Director of Development for approval.

    Illustrative data. Alder Court, its sites and its households are fictional.

    Now you move the date. Watch the plan answer.

    Drag the slip. DecisionOS re-plans only the households it touches. When the rules can't all be met, it tells you instead of guessing.

    Re-planned
    9affected
    9re-placed
    0need your decision
    0rule violations
    $14,200added moving cost
    Director of Developmentapproves
    Same inputs, same plan: plan c7e1·0a4dIllustrative data

    AI reads your data. Your rules make the decision.

    Each step has one owner. AI never makes the decision, and nothing goes ahead without a person.

    Your datasystems and files

    Connect

    Use integrations with your systems of record, or upload files such as rent rolls, construction schedules and budgets.

    4 sources · rent roll · schedule v14 · budget FY27 · households
    AIreads, never decides

    Understand

    AI cleans and organizes messy data. It maps each field and flags anything missing.

    ADA_REQ → needs accessible unit · 3 move-out dates missing
    Planning engineyour rules

    Decide

    Planning engines build a recommendation that follows your rules and constraints. The same inputs give the same plan every time.

    5 rules · 0 violations · run 2 = run 1
    Your teamapproval limits

    Approve

    Your team reviews and approves the plan. Anything above a person's approval limit goes to the next approver. DecisionOS logs every step.

    $14,200 > $10,000 → Director of Development
    AI handles messy data.Engines handle the decision.People handle the approval.

    Built for the decisions housing teams make every week.

    Each one runs on your data and your rules, and each one shows its work.

    I work in

    Phase 2 move plan example program
    212 of 212 placed

    Each household's match. Select a row to see why.

    HouseholdTemp unitMove dateRules
    #11473BR · accessibleA-102accessibleMar 235 / 5
    #06142BR · school ageA-106same districtMar 235 / 5
    #10234BRD-1084BRMar 305 / 5
    #08751BR · seniorD-103elevatorMar 305 / 5
    Why #1147 → A-102: needs an accessible unit, 3 bedrooms, and the notice period ends Mar 2. A-102 is the only open unit that meets all three.
    Rehab priority budget cut $4.2M → $3.6M
    14 deferred

    Score = life safety 40 · occupied 25 · system age 20 · cost per unit 15. Select a row.

    UnitMain issueCostScore
    Bldg 2 · 4BoccupiedRoof leak$38K92
    Bldg 1 · 2AoccupiedElectrical panel$21K88
    Bldg 2 · 6CoccupiedBoiler, 31 years$46K81
    budget line · $3.6M
    Bldg 3 · 1DvacantKitchen$29K54
    Bldg 3 · 5AvacantFlooring$12K41
    Why 4B scores 92: life safety 40 of 40, occupied 25 of 25, system age 14 of 20, cost per unit 13 of 15.
    Acquisition shortlist 9 buildings screened
    Criteria v3

    Ranked against criteria v3. Select a building.

    BuildingRent headroomUnits / $MFlags
    Maple Court84 units+11%6.20
    Elm Terrace120 units+7%5.41
    Harbor View56 units+9%4.81
    Linden Place140 units+2%5.13
    Flag on Elm Terrace: 2 open code violations. Source: city code-enforcement record.
    Scenario compare Alder Court, same data
    3 runs

    Same data, three runs. Select a scenario.

    Current plan
    Re-assigned
    0
    Temp units
    46
    Move budget
    $412K
    Bldg C slips 2 weeks
    Re-assigned
    9
    Temp units
    46
    Move budget
    $426K
    Mover quote +12%
    Re-assigned
    0
    Temp units
    46
    Move budget
    $461K
    Why the slip changes the plan: 9 Hollis St. households would stay past the lease end on Aug 31. DecisionOS moves only those 9. The other 37 keep their units.

    Built to be checked.

    You have to defend these decisions to boards, investors and HUD. Every claim below shows up on screen.

    Repeatable.

    Planning engines compute the plan. Run it again with the same inputs and you get the same answer.

    inputs8d03·5be2
    run 1 · 09:15plan c7e1·0a4d
    run 2 · 16:40plan c7e1·0a4d
    result✓ identical plan

    Explained.

    Every recommendation shows the constraints it followed and the numbers it used.

    Hollis 102 → Ward 1065 of 5
    accessible unit✓ step-free
    bedroom size✓ 3BR for 4 people
    notice period✓ after notice ends
    school district✓ same school zone
    lease dates✓ out by Aug 31

    Human-approved.

    Nothing runs on its own. Your people approve, and DecisionOS enforces approval limits.

    added cost$14,200
    Relocation manager→✓ Director of Development

    No rip-and-replace.

    Keep Yardi, Procore, Resonance and your spreadsheets. DecisionOS sits on top of them.

    Yardirent roll ✓
    Procoreconstruction schedule ✓
    Resonancehouseholds and units ✓
    Excelbudget FY27 ✓
    replacednothing
    One question to three tools: Building C slips two weeks. Who moves where?
    System of recordYardi, Procore
    Building C startMar 23
    Hollis St. lease endsAug 31
    Households · temp units46 · 56
    No recommendation. It stores the facts.
    AI chat toolgeneral purpose
    Asked at 10:02Move the larger families first. Bigger units are scarce.
    Asked again at 10:03Move seniors and accessible-unit households first.
    The answer changed. No rules shown.
    DecisionOSyour rules
    Reads Procore, Yardi, Resonance✓
    Checks 5 rules5 of 5
    Re-plans only who is affected9 moves
    Runs it againidentical
    Plan v15 · 0 violations · sent for approval.
    Stores your data✓ Yes✕ NoReads from your systems
    Recommends what to do✕ NoYes, but answers vary✓ Yes, by your rules
    Same answer every timen/a✕ No✓ Yes
    Shows its reasoningn/aPartly✓ Rules and numbers, every time

    What DecisionOS won't do.

    • Act on its own

      Nothing changes until a person approves it.

    • Fill gaps by guessing

      Missing data is flagged for your team to fix.

    • Replace your systems

      Yardi, Procore and Resonance stay your record.

    • Hide its rules

      Every rule is written down where your team can read it.

    The record you take to the board.

    Every decision leaves a record: what went in, which rules applied, what else was considered, and who approved it. Six months later, the answer to "why?" is one page.

    1. 1Inputs, with the source and version of each file.
    2. 2Rules applied, and whether each one held.
    3. 3Alternatives considered, and why the recommendation won.
    4. 4Approvals, with names, limits and times.
    Illustrative sample
    Decision record · DR-0415

    Alder Court · Building C re-plan

    Plan v15Mar 9 → Mar 23 slip

    Summary

    Building C's start moved two weeks. 9 Hollis St. households would stay past the lease end on Aug 31. DecisionOS re-planned those 9 and left the other 37 unchanged.

    Inputs

    Construction scheduleProcore · v15Mar 9, 09:14
    Rent rollYardi · Mar exportMar 1, 06:00
    Households and unitsResonance · liveMar 9, 09:14
    Relocation budgetExcel · FY27 v3Feb 20

    Rules applied

    ✓ Bedroom size✓ Accessible unit✓ Notice period✓ School district✓ Lease dates

    Alternatives considered

    OptionMovesRule breaksCost
    Keep plan v1409$0
    Extend Hollis St. lease 2 weeks00$18,900*
    Re-plan the 9 affected households Recommended90$14,200

    *Needs the landlord's sign-off, which is not confirmed. The re-plan costs less and depends on no one outside your team.

    Approvals

    • Relocation managerreviewed · limit $10,000 · sent up
    • Director of Developmentapproved · limit $50,000
    inputs 8d03·5be2 → plan c7e1·0a4d ApprovedMar 9 · 11:58

    Start with one decision.

    Your next relocation, a budget scenario or an acquisition pipeline. Pick one, and see a real plan on your own data.

    A few weeks

    Try

    Choose one decision. Send us an export. Within a few weeks, you'll see a real plan built on your own data.

    About three months

    Implement

    We set up the guardrails, approval rules and integrations your team needs.

    Ongoing

    Run

    DecisionOS becomes part of how your team plans, re-plans and reports.

    What we need to start

    Most teams already have these. Partial data is fine for a first look. Tick what you have.

    Tick what you have.

    DecisionOS is built by Resonance, the platform relocation and development teams use to run RAD, PACT and rehab programs.

    See the Resonance platform

    Questions teams ask first.

    Do we have to replace our current systems?

    No. DecisionOS reads from the systems and files you already use.

    Do we need Resonance to use DecisionOS?

    No. DecisionOS works on its own, on top of the systems you have now. If you use Resonance, DecisionOS reads from it like any other source.

    What if the plan is wrong?

    A plan is only as good as its rules and data, so DecisionOS makes both visible. If something looks off, your team can see why. Fix the rule or the data, and re-plan in minutes. Nothing goes ahead without approval.

    How is this different from ChatGPT?

    AI models are good at reading messy data, but they can give a different answer each time. DecisionOS uses AI to understand your data and planning engines to make the decision. The result is repeatable and auditable.

    What does it cost?

    Pricing depends on the decision and the portfolio. Every engagement starts with a short pilot on your own data.

    Bring us one decision.

    Tell us what you're trying to plan. We'll show you what it looks like in DecisionOS.

    1. 1We reply within one business day to set up a call about your decision.
    2. 2You send an export, such as a rent roll, schedule or budget.
    3. 3Within a few weeks, you see a plan built on your own data.
    The decision you want to plan

    Prefer email? sean@resonancehq.io

    Thanks. We'll be in touch.

    The Resonance team will reply within one business day to set up a call about your decision.